Main article image

Commercial

Brownfield sites utilised as retail park development sites often present specific ground improvement challenges arising from poor soils and also due to restricted access.

Underpinning is often required to secure existing structures before adjacent works can commence and Jet Grouting can prove to be the right choice in these scenarios. 

Programme constraints and health and Safety considerations continue to further challenge us and Soil Nailing can be utilised to form safe temporary or permanent earth works profiles in tight time scales.

Thumbnail for Drapers Garden, London

Drapers Garden, London

Keller Geotechnique has deployed its proprietary Multibell under reamed anchor system to assist the development of a new office complex at Drapers Gardens

Thumbnail for Point House Quay

Point House Quay

Keller Geotechnique has installed 46nr ground anchorages along a new 263m long river wall construction on the River Clyde in Glasgow.

Thumbnail for Cut off Slurry Wall with HDPE Membrane

Cut off Slurry Wall with HDPE Membrane

As part of this extensive redevelopment to enable the site to be redeveloped for commercial use.

Thumbnail for 1 New York St, Manchester

1 New York St, Manchester

High capacity Pali Radice mini piling installed in existing basements is a growth area for inner city redevelopment.